Total of 141,300 SF and a construction budget of about $42,000,000
Scope of Work: S&H was retained by CSA in 2013 to address HVAC system issues in the Phase 1 construction, which was designed by another engineering firm. S&H worked over the period of 2 years to realize a stable, controllable and temperature-acceptable geothermal HVAC system for the phase 1 construction buildings on campus. S&H was then hired under the Phase 2 and 3 construction contracts to design new buildings for the campus.
K - 12
The Perkiomen School New Dorm Buildings
Fort Dix Elementary School
School District: PEMBERTON TOWNSHIP SCHOOL DISTRICT
Schiller and Hersh has been performing engineering work at Fort Dix Elementary School for about 12 years. Over the past 12 years, various phases of renovations and additions have occurred through the Pemberton Township School District, which operates the Fort Dix Elementary School.
Eleanor Roosevelt Elementary School Renovations
Eleanor Roosevelt Elementary School Renovations School District: Pennsbury School District, Falls Township, PA Project Name: Renovation of the Eleanor Roosevelt Elementary School Project Size: 83,000 sq. ft. Services Provided: Mechanical (HVAC, Plumbing and Fire Protection) and Electrical engineering for a 27,500 SF addition to and renovation of an existing 55,500 SF school. The project achieved […]